More capacity than the 23 without a millimetre more footprint, which is exactly why it gets specified.
Get a price on this size
Send us your engineer’s drawings and we’ll work out quantities and price in one go — steel cut, drilled and finished to your specification and delivered direct to site.
152 x 152 x 30 dimensions and weight
| Size | Weight | Depth | Width | Web Thickness | Flange Thickness |
|---|---|---|---|---|---|
| (mm) | (kg/m) | (mm) | (mm) | (mm) | (mm) |
| 152 x 152 | 30 | 158 | 153 | 6.6 | 9.4 |
| Length | 6m | 7.5m | 9m | 12m |
|---|---|---|---|---|
| Total weight | 180kg | 225kg | 270kg | 360kg |
Approximate total weight by length — this is what determines how the column is offloaded and lifted into place.
What is a 152 x 152 x 30 used for?
The 23 and the 30 share a footprint. What separates them is metal, most of it in the flanges, which go from 6.8mm to 9.4mm. So this is the section specified when an engineer needs more out of a column but the architecture has already settled how big that column is allowed to be, which on domestic work is a constraint that arrives early and does not move. Picture a goal post frame where the beam has grown through design while the legs still have to disappear inside a 100mm stud wall. Height triggers it too. Columns shed capacity quickly as they get taller.
The most common domestic use of a column this size is the steel goal post frame — a beam over the opening with a column carrying each end down to the foundations — which covers when you need one and how the frame is put together.
Why a column is not just a beam stood on end
A universal column is close to square — this one is 158mm deep by 153mm wide — while a universal beam of similar weight is much deeper than it is wide. That difference is the whole point. A beam is designed to resist bending across a span, so depth is what it needs. A column mostly carries load straight down its length, and its enemy is buckling sideways, so it needs similar stiffness in both directions rather than a lot in one.
It is why swapping a UB for a UC of the same weight is not a like-for-like substitution in either direction, and why columns are specified by section rather than by weight alone.
What decides the size
Three things govern a column, and only one of them is the load.
- Effective length. How tall the column is between points where it is genuinely held. A tall unrestrained column carries far less than a short one of the same section.
- End restraint. How the column is fixed top and bottom. A column pinned at both ends behaves differently from one built in, and the assumption made in the calculations has to match what actually gets built.
- How the load arrives. A beam framing in on one side applies its reaction off-centre, which adds bending to the compression. Two beams balanced either side do not.
This is why there is no column equivalent of a span table, and why we do not publish one. A 152 x 152 x 30 that is comfortable in one position can be inadequate a metre taller or with a different connection at the top.
Grades, lengths and finishes
The 152 x 152 x 30 is normally supplied to BS EN 10025-2 in S275JR or S355JR. S355 is the higher strength grade and is increasingly the default across the supply network; if your calculations specify one grade, tell us, because the two are not interchangeable. Mill certificates can be supplied with the order on request.
Columns are supplied cut to your lengths rather than as standard mill lengths, and we can arrange:
- Welded base plates, cap plates and cleats — the parts that make a column installable
- Drilling and holes for holding-down bolts and beam connections
- Cutting to size — supplied ready to install
- Painting and priming, including intumescent coatings for exposed columns
- Galvanising for external or exposed positions
Base plate details matter more on a column than almost anything else we are asked to fabricate. The plate spreads the whole load into the foundation, and the holding-down bolt positions have to be agreed before concrete is poured rather than after.
Delivery
A 6m length of 152 x 152 x 30 weighs approximately 180kg. That is beyond safe manual handling, so plan for mechanical offload and a clear route to the opening. We deliver direct to site across London, the South and the Midlands, with HIAB lorry crane offload available on request. Columns are usually needed inside the building rather than at the kerb, so if the route in is tight — a terraced passage, a stairwell, limited headroom — tell us at quote stage and we will plan the delivery around it.
Other sizes in the range
| Size | Weight | Flange | |
|---|---|---|---|
| Previous | 152 x 152 x 23 UC | 23 kg/m | 6.8mm |
| Next | 152 x 152 x 37 UC | 37 kg/m | 11.5mm |
Also searched as: 152x152x30, 152 x 152 x 30 UC, UC 152x152x30, 152×152 UC30. Universal columns are also called UC sections, I-sections or, loosely, steel posts — and older drawings may show them as UB or “universal bearing pile” sizes, which are a different section entirely.
- All universal column sizes
- Universal beams (UB) — where the load spans rather than bears straight down
- RSJ beams
- Steel hollow sections — often the alternative where a column is on show
Common questions
What does 152 x 152 x 30 actually mean?
The first two figures are the nominal depth and width of the section in millimetres — 152mm by 152mm. The third is the weight in kilograms per metre, 30kg/m. Actual dimensions vary slightly from the nominal serial size as the section gets heavier: this one measures 158mm by 153mm.
How much does a 152 x 152 x 30 weigh?
30kg per metre. A 6m length is therefore around 180kg. Base plates and cap plates add to that, sometimes considerably on the heavier sections.
Can I use a universal beam instead?
Only if your engineer says so. UBs are sometimes used as columns and UCs are sometimes used as beams, but the two sections behave differently and the substitution has to be checked rather than assumed. Matching the weight per metre is not the same as matching the capacity.
Do you supply the base plates welded on?
Yes, fabricated to your engineer’s connection details. Send the drawings and we will price the column and the fabrication together. We work to supplied details and do not design the connection.
Is this the right size for my job?
We cannot tell you that. A column depends on its effective length, how it is restrained top and bottom, and how the load arrives — which is why Building Control requires calculations from a structural engineer. Once you have those, send them over and we will price the steel.
Ready for a price?
Send your engineer’s drawings or a cutting list and we’ll come back with quantities and a price. Large and small orders both welcome.